Datenbank #252
Split collecting_society into modules
Status: | Zurückgestellt | Start date: | ||
---|---|---|---|---|
Priority: | Normal | Due date: | ||
Assignee: | - | % Done: | 0% | |
Category: | - | Estimated time: | 5.00 h | |
Target version: | Repertoire 3) Testing phase III |
Description
The structure of the tryton modules should reflect the plugin structure of portal on order for the plugins to be useful. Right now, collecting_society also still contains the models for adore (hat, pocket, etc.). Some parts might even be packed into a general tryton module. I prepared the split by ordering the classes.
Proposed structure (repository/module names are not clear):
- Archive (GPL!)
- Portal
- Accounting (maybe in events or portal?)
- Events
- Adore
History
#1 Updated by Alexander Blum over 6 years ago
- Description updated (diff)
#2 Updated by Alexander Blum over 6 years ago
- Description updated (diff)
#3 Updated by Alexander Blum over 6 years ago
- Assignee set to Alexander Blum
#4 Updated by Alexander Blum over 6 years ago
- Status changed from Neu to Feedback
#5 Updated by Alexander Blum over 6 years ago
- Status changed from Feedback to Neu
- Archive, Adore in separate modules
- Later: separate portal module (web_user needs to be replaced)
#6 Updated by Alexander Blum about 6 years ago
- Assignee deleted (
Alexander Blum)
#7 Updated by Alexander Blum almost 6 years ago
- Target version changed from 1) Testing phase I to 2) Testing phase II
#8 Updated by Alexander Blum about 5 years ago
- Description updated (diff)
- Estimated time changed from 10.00 to 5.00
#9 Updated by Alexander Blum over 4 years ago
- Target version changed from 2) Testing phase II to 3) Testing phase III
#10 Updated by Alexander Blum almost 4 years ago
- Target version changed from 3) Testing phase III to Repertoire 3) Testing phase III
#11 Updated by Alexander Blum almost 4 years ago
- Project changed from repertoire to collecting_society
#12 Updated by Alexander Blum over 2 years ago
- Status changed from Neu to Zurückgestellt